Nobisoft · Legacy Maintenance
Service & process description · Nobisoft JSC · November 2026

Taking over, maintaining, upgrading and migrating legacy software systems

How Nobisoft takes over a running system (backend and frontend) from an in-house team or a previous vendor: assess the current state, transfer knowledge, maintain under SLA, upgrade end-of-life components and migrate step by step to a new tech stack. The page includes an estimator for timeline, effort and cost that you can adjust to your own system.

01 · TAKE OVERTakeoverAssessment, knowledge transfer, shadow, reverse shadow
02 · RUNMaintenanceP1–P4 tickets under SLA, patches, small enhancements
03 · UPGRADEUpgradeEnd-of-life runtime, frameworks, libraries, database
04 · MIGRATEMigrationNew stack slice by slice while the old system keeps running
8
stages, each with inputs and outputs for both parties
6
stage gates plus a monthly service review
7
roles: PM, BA, Architect, BE, FE, QA, DevOps
8–18
weeks from the first day of Assessment until Nobisoft runs the system independently
Overview

Three service lines on one system

Maintenance keeps the system running. Upgrade brings components back to versions that still receive fixes. Migration replaces the architecture or stack when keeping the old one costs more than building the new one. All three share the same takeover stage; pick a line to see its scope and load it into the estimator.

5 working principles

Stabilise first, change laterNo upgrade or migration before Nobisoft has passed reverse shadow.
Evidence-based pricingCode scan, CVE scan and ticket history are measured before capacity and price are fixed.
Incremental, not big-bangOne major version at a time; migrate slice by slice with the strangler fig pattern.
Current behaviour is the specCharacterization and parity tests prove the new system behaves like the old one.
Security from day oneLeast privilege, credential rotation at handover, DPA and SCCs for EU data.
Process

8 stages from first contact to continuous improvement

Stages 01–03 apply to every contract. Stage 04 runs monthly when maintenance is in scope. Stages 05 and 06–07 are projects with a start and an end, running in parallel with maintenance. Duration and effort on the right follow the configuration in the Cost estimate tab.

Responsibilities

Client inputs, Nobisoft outputs

A stage starts only when its inputs are in place and ends only when the receiving party accepts its outputs. Late inputs move the related milestone by the same amount; the SOW states this.

No.StageClient provides (input)Nobisoft delivers (output)Gate
Governance

Stage gates: GO / HOLD / STOP

Each gate has measurable criteria and a named approver. A gate is also the invoicing point for the matching payment milestone.

No.GateAfter stagePass criteriaApproved by
GO

Criteria met → move to the next stage and invoice the matching milestone.

HOLD

Missing inputs, missing access or blocking defects; a recovery plan and a review date are agreed.

STOP

Assessment shows the system cannot be taken over under the current constraints; stop after G1 and pay only the Assessment fee.

Organisation

Roles and RACI matrix

R = responsible · A = accountable · C = consulted · I = informed · N/A = not involved. The matrix is confirmed at the transition kick-off.

Client

Sponsor — budget, scope, go-live approval.

Product owner — backlog priority, change approval, UAT.

IT / Security — access, security policy, production changes.

Nobisoft

Delivery / Service Manager — plan, SLA, reporting, escalation.

BA — business rules, rules hidden in code, acceptance criteria.

Solution Architect / Tech Lead — Assessment, target architecture, code review.

Backend, Frontend Developer · QA · DevOps — fixes, upgrades, migration, testing, pipelines, monitoring.

Current team / previous vendor

Takes part in knowledge transfer and shadowing and answers questions on code and infrastructure until reverse shadow ends. This obligation belongs in your contract with the previous vendor (a transition assistance clause).

No.ActivitySponsorProduct ownerIT / SecurityNobisoftCurrent team
Steady-state maintenance

SLA, ticket priorities and support hours

Priority follows an impact × urgency matrix. Times run within the selected support window. The table is the proposed default; final figures are set in the SOW after Assessment.

No.PriorityDefinitionResponseRestore / workaroundPermanent fix
01P1 · CriticalSystem down, widespread data loss or corruption, security hole being exploited; no workaround30 minutes4 hours3 business days, with RCA
02P2 · HighCore function broken for many users; limited workaround2 hours1 business day10 business days
03P3 · MediumSecondary function broken, or a defect with a workaround1 business dayN/ANext release
04P4 · LowQuestion, cosmetic defect, information request2 business daysN/AAs planned

4 types of maintenance work (ISO/IEC 14764)

No.TypeContentReference share
01CorrectiveFix defects found after release21%
02AdaptiveAdapt to environment changes: OS, browsers, third-party APIs, security patches25%
03PerfectiveSmall enhancements, performance and usability improvements50%
04PreventiveRefactor hotspots, raise test coverage, clean up dependencies4%

Shares from the Lientz & Swanson survey (1980), still widely cited but old. The actual mix for your system is measured from ticket history during Assessment.

Monthly KPIs

No.KPIProposed target
01P1/P2 tickets within SLA≥ 95%
02Reopen rate≤ 5%
03Backlog older than 30 days≤ 10%
04MTTR by priorityTrend reported
05Capacity used vs baselineReported, alert above 90%
06Open High/Critical CVEsNone older than 30 days

Weekly operations report, monthly SLA report, quarterly steering committee.

Support windows for European and US clients

Vietnam is on UTC+7 with no daylight saving time, so overlap shifts with the seasons in Europe and the US. Overlap hours below are calculated from the time difference against 09:00–18:00 local business hours at the client.

No.Support windowWorking hours in VietnamOverlap with CET/CESTOverlap with US EasternSuits
01Standard08:30–17:30, Monday to Friday2.5–3.5 hours0 hoursEU clients, internal systems, few urgent incidents
02ExtendedShifted 10:00–19:00 plus an evening shift 19:00–23:00 for US contacts4–5 hours2–3 hoursDaily meetings, responses within the client's business hours
0324x7 for P1Extended window plus an out-of-hours on-call rotation, P1 onlyP1 covered around the clockP1 covered around the clockCustomer-facing systems, online revenue
Upgrade & migration

Choose a strategy per component, not for the whole system

Assessment assigns a strategy to each component (module, service, frontend, database). One system usually carries several strategies at once: keep the stable parts, upgrade the end-of-life parts, migrate the parts that block change.

No.StrategyWhat it doesWhen to choose itEffortRisk

Based on the AWS 7Rs (Retire, Retain, Rehost, Relocate, Replatform, Repurchase, Refactor) and the Microsoft Cloud Adoption Framework, with in-place Upgrade and Rewrite listed separately because clients ask about these two most often for web systems.

Strangler fig: migrate slice by slice while the old system keeps serving users

Figure: the three strangler fig steps. Orange lines carry traffic into the legacy system, teal lines into the new system, dashed boxes are components not yet built or already switched off. Trade-off: transitional code (routing, data sync) has to be maintained for as long as both systems run side by side.

Components already or soon out of support (as of 2026-11-29)

No.ComponentEnd of supportStatus

Source: endoflife.date, checked 2026-11-29. End of support means no more free security patches from the maintainer; the system still runs, but each new CVE stays unpatched.

Risk management

Key risks when taking over a legacy system

Risks are logged from Assessment onwards, each with an owner, warning signs and mitigation. Pick a point on the matrix or in the list.

Estimate

Estimated timeline, effort and cost

Pick the services, enter the system size and readiness. Effort is driven by workload (KLOC, tickets, components, screens, APIs, data tables) and risk factors; the full formulas are under How we estimate.

Figures are indicative estimates. Maintenance capacity and project prices are fixed after Assessment, once source code and ticket history have been measured.
Services to price
Pick one or more. The takeover stage is always included.
Current system
Thousands of lines of backend and frontend code, excluding third-party libraries
Existing documentation
Automated tests
Current team supports the handover
In-house team or previous vendor still available for knowledge transfer and shadowing
Maintenance
Incidents, service requests, small changes; average of the last 6 months
Feature improvements included in the monthly fee, on top of tickets
Support window
Upgrade
Runtime, backend framework, frontend framework, database, major libraries
Version gap
Migration
Strategy
Commercial
One rate for all roles
Not applied to maintenance, which is priced by capacity
To steady state
Monthly maintenance fee
One-time cost
First 12 months total

Roadmap (Gantt)

Hover for details · click to open the stage
Stage gateHypercareMonthly maintenance, ongoing

Effort by stage

man-months

Acceptance milestones

Weeks from the first day of Assessment

Effort by role

man-months · maintenance in FTE per month

Package comparison (same system parameters)

Excludes cloud infrastructure, third-party licences and tools paid directly by the client. The first-12-months total charges maintenance from the steady-state date; during transition only the transition fee applies.

Method

How effort, timeline and cost are calculated

Every figure in the estimator traces back to the parameters below. Factors are calibrated with Assessment data: actual ticket volume, code scan results, test coverage.

01 · Monthly maintenance

Fixed monthly capacity driven by ticket and enhancement volume, with a floor so that someone always knows the whole codebase.

Dev = max( (Tickets × 5 h × kDoc × kTest + Enhancement hours × kTest) ÷ 136, KLOC ÷ 250, 1 ) Extended window: Dev × 1.1 24x7 for P1: Dev + 0.4 (on-call) QA = 25% Dev DevOps = 0.1 + 8% Dev BA = 8% Dev PM / Service manager = 8% of total, minimum 0.15 Monthly fee = Total FTE × Rate

02 · Assessment and transition

Assessment is a fixed package. Transition uses the future maintenance team, ramping up from shadow to reverse shadow.

Assessment (weeks) = 2 + KLOC ÷ 250 (+0.5 with migration), within 2–4.5 Assessment (MM) = weeks ÷ 4.33 × 2.2 people Transition (weeks) = 4 + KLOC ÷ 150 + (Doc − 1) + 1.5 × (Support − 1), within 4–14 Transition (MM) = weeks ÷ 4.33 × (75% of maintenance team + 0.5) Without maintenance: 3–8 weeks, team of 2.5 (business KT for the project)

03 · Upgrade

Driven by the number of components needing a major upgrade, the version gap and code size; QA grows when tests are missing because a regression baseline has to be built first.

Dev = Components × Gap factor × (KLOC ÷ 100)^0.6 × kTest × √kDoc Gap factor: 1 major 0.5 MM · 2–3 majors 1.2 MM · out of support for years 2.5 MM QA = Dev × (35% + 15% × (Test − 1)) DevOps = 10% Dev PM = 10% (Dev + QA + DevOps) Total = (Dev + QA + DevOps + PM) × (1 + Contingency) Team = 2–6 people; weeks = MM ÷ team × 4.33, minimum 4

04 · Migration and go-live

Workload is counted in screens, APIs and data tables; the strategy decides how much code is rewritten.

FE hours = Screens × 40 × kStr × kDoc BE hours = (APIs × 24 + Tables × 12) × kStr × kDoc kStr: Replatform 0.35 · Incremental refactor 0.7 · Rewrite 1.0 Architect = 8% Dev + 0.5 BA = 6% / 10% / 14% Dev by strategy QA = Dev × (30% + 5% × (Test − 1)) DevOps = 10% Dev + 0.5 PM = 10% of total; Total × (1 + Contingency); team 3–14 people Go-live: cutover 2 / 3 / 4 weeks × 3 people + hypercare 2 / 4 / 6 weeks × 2 people

Shared parameters

No.ParameterValueBasis
011 man-month (MM)160 hours = 20 days × 8 hoursNobisoft convention. COCOMO II uses 152 hours, so COCOMO factors are converted before use
02Productive ticket hours per FTE136 hours / month (85%)Net of meetings, reporting, documentation. Nobisoft assumption
03Average hours per ticket5 hours: analyse, fix, test, deployMix of short service requests and incidents that need code changes. Calibrated from ticket history during Assessment
04Maintenance floor1 Dev per 250 KLOC, minimum 1Boehm: 1 maintainer per ~32 KLOC when ~9% of the code changes each year. The floor only retains knowledge and excludes enhancements
05kDoc: documentation factor1.0 / 1.15 / 1.35COCOMO II: unfamiliarity (UNFM) and understandability (SU) raise modification effort by up to ~50%
06kTest: automated test factor0.9 / 1.0 / 1.25Without tests, every change needs extra manual regression testing
07Migration strategy factor kStr0.35 / 0.7 / 1.0Share of code to be rewritten. Rewrite is the 1.0 baseline
08Default risk contingency20%Study of 114 Java systems: library migrations broke the build in 67% of projects and touched ~15% of the code
09Blended rateUSD $2,800 / MMNobisoft single rate for all roles; adjustable in the estimator
Decision: maintenance is priced as fixed monthly capacity, not per ticket. Rationale: you get a stable budget and the team retains system knowledge even in quiet months. Rejected option: per-ticket pricing, because without reliable ticket history the unit price must carry a large risk margin, and quiet months cannot fund the people who know the code. After 3 months both parties review capacity against actual ticket volume.
Benchmarks

Checked against standards and published data

The process and estimation factors are checked against standards (ISO/IEC 14764, ITIL 4), estimation models (COCOMO II, Capers Jones, ISBSG), AWS and Microsoft guidance, and market data. Vendor self-reported figures are labelled as such.

Modernization success rates

Rewrite from scratch
26%
succeeded; 54% challenged, 20% failed
Incremental modernization
71%
succeeded; 28% challenged, 1% failed
Modernization projects over budget
> 71%
27% overran by more than 51%

First two cards: Standish Group 2020, commissioned by Micro Focus (a modernization tool vendor). Third card: Ensono survey, a service provider. All three are sponsored figures, but they point the same way: incremental migration carries less risk than a one-shot rewrite.

Commercial & legal

Engagement models

Each service line has a pricing model matched to how certain its scope is. The contract is one MSA plus a separate SOW per service.

Start here

Assessment

Fixed price, 2–4.5 weeks. The results remain usable even if you choose another provider.

Payment: 100% on report delivery

One-time

Transition

Fixed price per the transition plan; ends at gate G2.

Payment: 50% at kick-off, 50% at G2

Monthly

Capacity-based maintenance

Fixed monthly fee for baseline hours and the SLA commitment. Hours above the baseline are billed at the same rate, only with your prior written approval.

Payment: end of each month, with the SLA report

Project

Upgrade / migration

Fixed price per phase by gate, or a Dedicated Team when the backlog is still changing a lot.

Payment: at gates G3, G4, G5

Key contract terms
  • Service credits: P1/P2 KPIs only, proposed cap of 10% of the monthly fee, deducted from the next invoice. The first 3 months of steady state are burn-in: measured and reported but not penalised. Earn-back applies when later months meet the KPIs.
  • Readiness gate: SLA and service credits start only after gate G2. Time spent waiting for client input does not count towards ticket resolution time.
  • Large changes: requests above ~80 hours become a separately quoted change request.
  • Intellectual property: you keep all code and IP; rights transfer on final payment.
  • Exit: at contract end, Nobisoft runs reverse knowledge transfer per the exit plan and hands over repositories, documentation, runbooks and credentials.
  • Post-go-live warranty: defects caused by Nobisoft are fixed free of charge for the period set in the SOW.
  • Limitation of liability: per the MSA; the common market position is 12 months of fees, with a separate cap possible for data protection.
Data protection and compliance for EU and US clients
  • EU: Vietnam has no EU adequacy decision. When Nobisoft accesses personal data, the parties sign a DPA under GDPR Art. 28, Standard Contractual Clauses Module 2 and a transfer impact assessment (TIA).
  • US: CCPA/CPRA service provider terms when California residents' data is involved; SOC 2 or ISO 27001 is commonly requested as evidence of controls.
  • Vietnam: the Law on Personal Data Protection 91/2025/QH15 and Decree 356/2025/ND-CP have applied since 2026-01-01; Nobisoft acts as the data processor.
  • Technical defaults: dev/test environments use anonymised or synthetic data; production access through personal accounts with MFA and logging; no production data stored on personal devices.
  • Lower-risk option for data transfer: the Nobisoft team works inside your environment through VDI or a bastion host, so data never leaves your infrastructure.

Note: this is technical guidance, not legal advice. Whether Article 21 of Decree 356/2025 applies to processing services for foreign clients is pending confirmation from Vietnamese counsel.

Next step

Assessment preparation checklist

You do not need everything to start. Read access to the repository and one technical contact are enough for Nobisoft to run the code scan in the first week. Progress is saved in this browser.

Readiness

0%

How Assessment runs

01
Access and build
Receive read access, build and run the system in a separate environment
02
Measure and interview
Code scan, CVE scan, ticket analysis, SME interviews
03
Roadmap and estimate
Strategy per component, maintenance capacity, upgrade and migration prices
04
GO / STOP
You choose the scope and sign the MSA and SOW, or stop here
Q&A

Frequently asked questions